Strip Out Division.

We offer expertise in demolition and cost reduction.

Demolition and strip out works.

Strip out” is an umbrella term that encompasses all operations aimed at removing non-structural elements of buildings, i.e. selective demolition interventions aimed at differentiating waste materials in order to optimize the recovery process.

We provide strip out services that give new life to buildings and prepare them for refurbishment or demolition.

Thanks to many years of experience in the field, our specialists are skilled to tackle any challenges.

Services.

Special Demolitions
Special Demolitions

Through innovative and flexible methods.

Strip out services
Strip out services

Removal of non-structural elements of buildings.

Differentiation <br>of the waste produced
Differentiation
of the waste produced

Aimed at optimizing the material recovery process.

Technical and regulatory advice
Technical and regulatory advice

We offer a comprehensive and reliable analysis.

Our Mission.

The distinguishing feature of this division is our great attention to detail. All team members, from managers to construction site operators, show an extraordinary commitment to their work, also thanks to the strong sense of belonging which has always characterized the HTR community. All division members work in synergy. There is no competition or rivalry: the only thing that matters is to complete the job within the established deadline, providing our customers with the best possible outcome.”

  • Domenico Trucchia,
  • Head of the Strip Out Division
Contact us for more information
  • Domenico Trucchia
  • Head of Division
  • Mauro De Berardinis
  • Quantity Surveyor
  • Matteo Passerini
  • Engineer
  • Marco Tramontozzi
  • Engineer

"Our main goal is to promote ethical and sustainable development among our shareholders."

Enrico Piermattei
Board Member

The Strip Out Division by the numbers

The numbers below refer to the last five years (2015-2020). We provide our services across the country.
70
Construction sites managed
39271
Tons of waste managed, of which 90% was sent for recovery
100
average resources employed

Case History

Via Sciangai, Mostacciano. Strip out works carried out on a total area of over 40,000 square meters.

The works were carried out on a six-tower building covering a total surface of over 40,000 square meters. The project was completed within the established deadline.

An average of 30 people worked on the project for 8 months, for a total of 46,000 hours worked. Over 3,000 tons of waste were managed.

Considering the number of hours worked and the volume of waste managed, the job was completed without any sanctions.

Over 490 waste transports were carried out.

8

consecutive months of work for a total amount of 46,000 hours worked.

3.000

Tons of waste managed. 490 waste transports were carried out.

30

Average workers employed on the project.