We have your health and the environment at heart.
Over the years we have developed and refined specific skills for handling and removing any type of Asbestos Containing Material (ACM). We deal both with friable and with non-friable asbestos, and our areas of intervention range from industrial plants to civil and military buildings, from dismantled industrial areas to former asbestos quarries.
We carried out thousands of interventions thanks to a highly specialized internal organization, which allows us to manage remediation projects requiring high experience and operational efficiency as well as low costs. Every year, an average of about 200 ACM and MMVF remediation sites are opened, with their economic value ranging from a few thousand euros to around 1 million euros.
We are also highly experienced in managing Man-Made Vitreous Fibers (MMVF), classified as carcinogenic similarly to asbestos, although so far there is no national legislation concerning this subject.
Removal of all types of Asbestos-Containing Material (ACM)
Removal of all types of Asbestos-Containing Material (ACM)
Management of Man-Made Vitreous Fibers (MMVF), which are classified as carcinogenic.
Safety improvement projects on asbestos-contaminated sites.
“The Division’s mission is to satisfy the customer’s needs in full compliance with environmental and safety regulations, while at the same time pursuing the project-specific qualitative and economic objectives.
We define ourselves as the litmus test of the company, since we are often in the forefront when it comes to intervene on heterogeneous sites. In some way our work plays a pivotal role in the success of an integrated project involving multiple divisions.”
Sandro Caira,
Head of Asbestos Remediation Division
"HTR has increased its potential over the years, investing in human resources and equipment and reaching significant numbers. However, our team, who have actively contributed to the growth of the company, will always remain at the very heart of the project".
The intervention was carried out in the city center of Milan, facing logistical challenges and obvious location-related difficulties.
• Overall building area: 42,000 square meters
• Duration of the work: 10 months in compliance with the agreed deadline
• Resources employed: 20 specialized operators
• Hours worked: 45,000 hours
• Tons of waste managed: 100 tons of hazardous waste
Considering the number of hours worked, the additional remediation of MMVF, the volume of waste managed, the numerous inspections carried out by the supervisory bodies on the remediation sites (16 confined areas ranging from 100 to 800 square meters) the project was completed without any sanctions.
Hours of production with the employment of an average of 20 specialized operators.
Tons of hazardous waste produced and managed.
Months the project was completed within the agreed deadline.